This Old House - Season 44 Episode 24 Ipswich: New Life
5.2030 minutes
A granite veneer water table is installed. The old roof boards are installed on the ceiling of the new ell. A dry laid stone wall is built. The plumbing manifold is discussed. A carpenter talks about leaving corporate and returning to the trades.